Time: 2022-01-06 14:53:16
Recently, unmanned cluster construction of asphalt pavement is underway on Daguang Expressway.In the unmanned mode, the roller can realize multiple functions such as automatic lane change, automatic driving into the cons···
Time: 2022-01-05 16:00:43
There are 6T, 12T, 15T, 20T for four-wheel drive truck digging, single fully enclosed cab, automatic rear unloading, optional components: breaker, rotary wood grabber.Features:1. Excellent waterproof performance. The who···
Time: 2022-01-04 13:57:06
At present, the products in the industry that can drive with full counterweights have the problems of insufficient power for heavy-duty transitions due to their low power matching level. On the other hand, not to mention···
Time: 2021-12-31 15:01:52
XCMG's new generation of XGH5160TXSD6 washing and sweeping vehicle, the air duct, power and waterway systems have been comprehensively improved, and the performance of the vehicle has been improved in terms of reliab···
Time: 2021-12-30 15:39:23
The Philippine North-South Railway (NSCR-EX) project has a total investment of US$15.1 billion, connecting the capital of the Philippines, Manila, and the capital of Albay Province, Legazpi City. 10 XCMG rough terrain cr···
Time: 2021-12-29 11:39:04
Recently, at the Zaragoza Construction Machinery and Mining Machinery Exhibition (SMOPYC) in Spain, 20 high-tech products of XCMG were exhibited for the first time, and many orders were received. Among them, the all-terr···
Time: 2021-12-28 13:13:56
XCMG Crane QY25K5D_3 has five 42m main booms, the boom length is 10.8m, the amplitude is 5m, and the lifting weight is 22.6t.The boom length is 30.3m, and the amplitude is 20m. The lifting weight is 2.6t. The boom is 42m···
Time: 2021-12-27 13:35:44
XCMG's largest tonnage tower crane XGT2230-100S is safe, reliable, intelligent and efficient.1. The high-strength inverted triangle boom is designed with inverted triangle section and double upper main chord. The mai···
Time: 2021-12-24 10:59:58
The XCMG crane QY25K5C-II has a lifting capacity of 4.35t under high-frequency working conditions of 35.8m and an amplitude of 18m. It has a 5-section U-shaped main boom with a full boom length of 44m and a longest boom ···
Time: 2021-12-22 14:56:53
The contract value of the N108 section of the Singapore North-South Corridor project is approximately RMB 2.24 billion, which requires the excavation of a continuous wall and the construction of a two-way six-lane underg···